Risk Management · 2025

Risk Management Policy & Plan

Policy & Plan Description

The Company firmly believes that effective risk management is a fundamental pillar of good corporate governance and a critical prerequisite for sustainable long-term growth. All types of risks, whether arising from internal or external factors, have the potential to impact the Company’s operations, financial position, and reputation. Accordingly, the Company adopts a proactive and systematic approach to risk management by integrating risk management processes into its strategies, operational plans, and business decision-making at all organizational levels.

The Company adopts the internationally recognized risk management framework of the Committee of Sponsoring Organizations of the Treadway Commission (COSO) as its principal guideline. This framework encompasses six key components: (1) establishing the organizational environment and risk culture; (2) setting strategic objectives aligned with the Company’s risk appetite; (3) identifying and categorizing risks; (4) assessing risks using both quantitative and qualitative approaches; (5) designing and implementing risk response measures; and (6) monitoring, reviewing, and reporting outcomes to stakeholders at all levels.

Risk Governance Structure

The Board of Directors holds the highest responsibility for establishing overall risk management policies and frameworks. The Board has delegated authority to the Risk Management Committee to oversee, monitor, and continuously evaluate the effectiveness of the Company’s risk management system.

The Risk Management Committee consists of no fewer than three directors, with the Chairman of the Risk Management Committee preferably being an independent director to ensure the independent and impartial execution of duties.

The key roles and responsibilities of the Risk Management Committee are as follows:

  • Establish the overall risk management policy and define the Company’s risk appetite for submission to the Board of Directors for approval.

  • Formulate risk management guidelines and strategies in alignment with the Company’s business direction and approved policies.

  • Oversee both internal and external risks, including strategic, operational, financial, and compliance risks.

  • Regularly review and assess the effectiveness of the risk management system and promote its development in line with international standards.

  • Report risk management performance to the Board of Directors and the Audit Committee on a regular basis.

Risk Situation in 2025

In 2025, Thailand’s real estate development sector faced complex and interrelated risk factors from multiple directions. These included slower-than-expected macroeconomic recovery, persistently high household debt levels, a significant increase in mortgage rejection rates, sustained high construction material and labor costs, and intense market competition driven by inventory clearance efforts of major developers.

For the Company in particular, 2025 was also a significant transition period. The newly appointed management team undertook a comprehensive review and realignment of strategic direction, including accelerating the sale of existing inventory, developing new projects in high-potential locations, revitalizing the Preecha Complex building, and expanding into the hotel service business.

This transition created increased demand for capital and skilled personnel, both of which required careful and prudent management.

Management has continuously reported the Company’s risk situation to the Risk Management Committee and the Board of Directors throughout the year to ensure timely adjustments to risk mitigation measures in response to evolving conditions.

Risks to the Company's Business Operations

Introduction

The Company has identified risk factors that may significantly impact its business operations and financial position, prioritizing them based on an assessment of their likelihood and potential impact. It should be noted that the risk factors presented in this section are not an exhaustive list of all risks faced by the Company, but rather significant risks that management and the Board of Directors prioritize for close monitoring and management.

Risk Register

Risk NameRisk CharacteristicsConsequencesManagement MeasuresRelated Risk Factors
Risk from economic conditions and consumer purchasing power

The real estate development business is closely linked to the economic cycle. In 2025, the Thai economy expanded at a limited rate and below its potential, amidst long-standing structural problems, particularly the high level of household debt to gross domestic product (GDP). This pressure affects the purchasing power and borrowing capacity of middle- and low-income consumers, who are the primary target group for the housing market priced below 3 million baht.

Financial institutions have continuously tightened their consideration of housing loans by raising the standards for assessing borrowers' debt repayment ability and scrutinizing total debt-to-income ratios more thoroughly. Consequently, the rejection rate for housing loans in the mid-to-low price segments has significantly increased. Customers who genuinely intend to purchase but do not meet the loan approval criteria account for a significant proportion of bookings, resulting in actual transfer income being lower than contractual sales.

Such conditions affect all operators in the industry, including the Company, which has existing stock projects at price levels that may face relatively high credit risk. Meanwhile, economic volatility also impacts consumer confidence in deciding to purchase high-value assets, which often requires assurance of long-term income stability and employment.

Risk Management and Mitigation Measures

The Company implements several proactive measures to manage this risk as follows:

  • Credit Qualification Check Before Booking: The Company requires an initial loan eligibility check for all customers from the booking stage to reduce the risk of contract cancellation due to loan disapproval and to allow customers time to prepare documents and adjust their financial status before the transfer date.

  • Coordination with Financial Institutions: The Company maintains good relationships with various partner banks and financial institutions to assist customers in applying for loans through diverse channels, including special loan programs for residential properties in approved projects.

  • Developing Recurring Income to Reduce Reliance on Transfer Income: The Company accelerates the development of its office building rental business and hotel services business to generate more consistent and predictable revenue streams, thereby reducing the volatility of performance that was primarily dependent on property transfers.

  • Continuous Monitoring of Economic Indicators: Management regularly monitors macroeconomic data, interest rates, loan approval rates, and consumer confidence to promptly adjust sales strategies and pricing.

756 · Description: Change in laws and regulations · Info category: COMPLIANCE_RISK · 730 · Description: Government policy · Info category: STRATEGIC_RISK · 764 · Description: Fluctuation in exchange rates, interest rates, or the inflation rate · Info category: FINANCIAL_RISK
Risk from business competition

The Thai real estate development industry comprises numerous operators, ranging from large, publicly listed companies possessing substantial resources and high price competitiveness, to small local operators. Competition within the mid-to-low-priced housing market is exceptionally fierce, primarily because this segment is underpinned by significant genuine demand, yet purchasing power remains constrained.

During a market slowdown, large developers often implement aggressive inventory clearance policies through price discounts, special promotions, and transfer fee support, which creates pressure on the gross profit margins of developers in the market. This competition results in increased price pressure on small and medium-sized developers, who have higher unit costs.

In addition, the office for rent market in Bangkok continues to see a steady increase in new rental supply from several completed large-scale projects. This has resulted in a declining trend in occupancy rates for unrenovated Grade B and Grade C buildings, and increased bargaining power for tenants.

Risk Management and Mitigation Measures

  • Restructuring Product Portfolio: The Company is accelerating the disposal of inventory from older projects with low gross profit margins to reduce holding costs and unlock capital for developing new projects with higher profitability. These new projects are designed to meet the needs of specific target groups in particular locations to reduce direct competition with major developers.

  • Differentiating through Quality: The Company places significant emphasis on the quality of construction work and materials used, by utilizing a newly established in-house team of engineers and architects to supervise and control standards, to build reputation and credibility among target customers.

  • Superior after-sales service compared to competitors: The Company aims to develop its after-sales customer service system to create satisfaction and word-of-mouth referrals, which is a low-cost but highly effective marketing channel, especially in markets where buyers prioritize trust in project developers.

  • Upgrading Preecha Complex Building: The Company plans a major renovation of Preecha Complex Building to elevate its standards and facilities, enhance its competitiveness in attracting tenants, and significantly increase the occupancy rate from the current level of approximately 50%.

756 · Description: Change in laws and regulations · Info category: COMPLIANCE_RISK · 728 · Description: Volatility in the industry in which the company operates · Info category: STRATEGIC_RISK · 739 · Description: Shortage or reliance on skilled workers · Info category: OPERATIONAL_RISK · 762 · Description: Change in financial and investment policies of financial institutions that affect business operations · Info category: FINANCIAL_RISK · 729 · Description: Behavior or needs of customers / consumers · Info category: STRATEGIC_RISK · 730 · Description: Government policy · Info category: STRATEGIC_RISK · 764 · Description: Fluctuation in exchange rates, interest rates, or the inflation rate · Info category: FINANCIAL_RISK · 743 · Description: Product obsolescence · Info category: OPERATIONAL_RISK · 746 · Description: Delays in the development of future projects · Info category: OPERATIONAL_RISK · 1715 · Description: Economic risk · Info category: STRATEGIC_RISK · 752 · Description: Impact from population structure · Info category: OPERATIONAL_RISK
Risk of future land acquisition for real estate development projects

Land is the most crucial production factor for real estate development businesses and possesses unique characteristics that prevent it from being substituted or imported. Prime locations in Bangkok and its vicinity have experienced continuous long-term price appreciation due to urban expansion and the development of transportation infrastructure, particularly electric railways, which exerts pressure on land costs in areas connected to mass transit systems.

For the Company, which aims to continuously develop new projects according to its strategic plan, the acquisition of land at appropriate prices and times is crucial for the success of its business plan. Key risks in this area include competition from other developers for the same land plots, fluctuations in land prices that may alter project feasibility before a purchase decision is made, legal risks and encumbrances that may be hidden in title deeds, and the risk of holding land without a clear development plan, which incurs financial costs without generating revenue.

In 2025, the Company acquired two significant land plots: the Saothonghin Project and the Suwinthawong Project. Both plots were inspected and appraised by independent valuers and received approval from the Audit Committee prior to the decision.

  • Policy for immediate land acquisition and development: The Company has a clear policy to acquire land only when a project development plan has been thoroughly studied for feasibility and development can commence within a reasonable timeframe. There is no policy to hold undeveloped land for speculation or to await development in the distant future, in order to maintain capital utilization efficiency.

  • Comprehensive land due diligence process: The Company conducts comprehensive due diligence on land status prior to making a purchase decision. This includes verification of title deeds, encumbrances, land use restrictions according to city planning, physical conditions, and environmental pollution surveys, to ensure that the proposed price reflects the true value and any potential hidden risks.

  • Valuation by independent experts: In cases of transactions that may involve conflicts of interest or large-scale transactions, the Company engages certified independent appraisers to verify the reasonableness of the price and discloses information transparently in accordance with stock exchange regulations.

  • Diversification of locations and project types: The Company diversifies risk by developing projects in various locations and formats, including housing estates, townhouses, condominiums, as well as income-generating properties. This is to reduce over-reliance on the success of any single project or location.

756 · Description: Change in laws and regulations · Info category: COMPLIANCE_RISK · 739 · Description: Shortage or reliance on skilled workers · Info category: OPERATIONAL_RISK · 730 · Description: Government policy · Info category: STRATEGIC_RISK · 764 · Description: Fluctuation in exchange rates, interest rates, or the inflation rate · Info category: FINANCIAL_RISK
Liquidity and Funding Risk

Environment and Risk Factors

The real estate development business is characterized by high capital requirements and a long cash cycle, from land acquisition and construction to property transfer and payment collection. The period between investment and revenue generation can span several years, making liquidity and working capital management a significant challenge.

For the Company in 2025, which is a period of business transition, the new management has increased investments to build new revenue streams, including new residential development projects, the renovation of Preecha Complex building, and hotel operations. Meanwhile, revenue from existing projects remains low during this transition, leading to a significant net capital requirement during this period. As of the end of 2025, the Company had long-term loans from financial institutions totaling 107.56 million baht, which increased from the previous year to support capital needs.

Key liquidity risks include the risk of revenue from property transfers being lower than anticipated due to a high loan rejection rate or a postponement of transfer schedules, the risk of construction or renovation costs exceeding the budget, and the risk of unfavorable changes in financing terms.

Should the company fail to effectively manage liquidity and working capital risks, it could have multi-dimensional impacts, including operations, financial position, and stakeholder confidence.

In terms of operations, delays or insufficient cash flow may prevent the company from executing real estate development projects according to the planned schedule. Examples include construction delays, postponement of project completion dates, or inability to deliver projects to customers within the agreed timeframe. This could impact the company's revenue and reputation.

Regarding financial position, if revenue from property transfers is lower than anticipated or project development costs exceed estimates, it may lead to tight cash flow for the company and necessitate reliance on additional external funding sources. This could result in increased debt burden and financial costs, as well as potentially affecting the ability to comply with financial covenants stipulated by financial institutions.

Furthermore, changes in financing conditions, such as an increase in interest rates or stricter credit approval processes by financial institutions, may result in the company incurring higher financial costs or facing greater difficulty in accessing funding sources. This would directly impact the company's ability to expand its business and undertake future projects.

Regarding stakeholder confidence, uncertainty in liquidity or operational performance may affect the confidence of customers, investors, creditors, and business partners. This could influence decisions regarding investment, credit provision, or long-term transactions with the company.

Therefore, liquidity and working capital risks are considered critical factors that the company must prioritize and manage closely to maintain financial stability and support sustainable business growth.

  • Detailed and prudent cash flow planning: Management regularly prepares short-term and medium-term cash flow forecasts by simulating various scenarios to assess liquidity adequacy under different assumptions and establish contingency plans for unexpected situations.

  • Utilizing core assets as collateral for credit: Precha Complex Building, a property located adjacent to Sutthisan BTS Station, has an appraised collateral value that can serve as a basis for securing additional credit from financial institutions to support funding requirements during the transition period.

  • Maintaining credit lines with multiple financial institutions: The Company manages relationships with several financial institutions to ensure flexibility in accessing funding sources and avoid reliance on a single financial institution.

  • Strict control over operating expenses: The Company has a stringent policy for controlling operating expenses to reduce cash usage in daily operations and maintain liquidity for investments in long-term value-generating projects.

  • Prioritization of investment projects: In cases where liquidity is limited, the Company has a process for prioritizing investment projects based on expected returns, payback period, and strategic importance, to ensure the most efficient allocation of available funds.

761 · Description: Insufficient sources of funding · Info category: FINANCIAL_RISK · 762 · Description: Change in financial and investment policies of financial institutions that affect business operations · Info category: FINANCIAL_RISK · 730 · Description: Government policy · Info category: STRATEGIC_RISK · 764 · Description: Fluctuation in exchange rates, interest rates, or the inflation rate · Info category: FINANCIAL_RISK · 1724 · Description: Liquidity risk · Info category: FINANCIAL_RISK
Risk from changes in relevant laws and regulations

Environment and Risk Factors

The real estate development business is subject to a variety of laws and regulations from multiple government agencies, which are constantly changing and evolving. Key laws and regulations include: town planning laws and land use regulations; regulations concerning Floor Area Ratio (FAR) and Open Space Ratio (OSR); building control laws; environmental laws and requirements for preparing Environmental Impact Assessment (EIA) reports; consumer protection laws in the real estate business; as well as policies and regulations related to the hotel business and accommodation operations.

Such changes in laws and regulations may impact the Company in several dimensions, including increased compliance costs, restrictions on the type or size of projects that can be developed on existing land, extended timeframes for obtaining approvals and licenses, and the necessity to modify designs or plans for projects under development. Furthermore, for the hotel business and office building rental business, which are significant directions for the Company's business expansion, changes in policies and regulations by relevant regulatory bodies may affect the business model and long-term profitability.

In the past year, there has been some uncertainty regarding the consideration guidelines of the Expert Committee (EIA Committee) in evaluating EIA reports, which may affect the duration and conditions for developing certain types of projects.

Changes in laws, regulations, and requirements related to the real estate development business may significantly impact the company in terms of operations, costs, and the ability to develop future projects. Regarding operations, modifications to urban planning regulations, land use policies, or ratio restrictions such as FAR and OSR may prevent the company from developing projects as planned, or necessitate reducing project size, adjusting development formats, or changing project types, which could affect the revenue generation potential and returns of the projects.

In terms of costs, increased stringency in building control laws, environmental laws, or requirements for preparing EIA reports may lead to higher costs for the company in design, construction, and legal compliance, as well as additional expenses for report preparation, engaging consultants, and adapting projects to meet new requirements.

Regarding project timelines, delays in obtaining permit approvals or EIA report considerations, especially in cases of uncertainty regarding the review guidelines of the Expert Committee, may prevent projects from commencing construction or operations as scheduled, leading to deferred revenue recognition and impacting the company's cash flow.

Furthermore, for business expansion into hotel and office building rental businesses, changes in policies or regulations by relevant regulatory bodies may affect business operating conditions, service models, or restrictions on property utilization, which could impact occupancy rates, rental levels, and long-term profitability.

Overall, the uncertainty of laws and regulations may require the company to continuously adjust its project development strategies and could impact the company's operating performance, financial position, and long-term growth plans.

Risk Management and Mitigation Measures

  • Continuous Monitoring of Legal and Regulatory Changes: The Company has a system in place to monitor changes in laws, regulations, and policies of relevant government agencies and incorporates such information into strategic planning and decision-making.

  • Feasibility Studies Based on Current Regulations: The Company conducts feasibility studies for all projects based on currently enforced requirements and laws and establishes a safety margin in design to accommodate potential future changes.

  • Utilization of Legal Counsel and Specialized Experts: The Company utilizes the services of legal counsel, project approval specialists, and environmental consultants to ensure that all projects are executed in compliance with legal requirements and are prepared for the approval process.

  • Flexible Project Design: Where feasible, the Company designs projects with flexibility to adapt product forms and types in response to regulatory changes and market demands.

728 · Description: Volatility in the industry in which the company operates · Info category: STRATEGIC_RISK · 756 · Description: Change in laws and regulations · Info category: COMPLIANCE_RISK · 739 · Description: Shortage or reliance on skilled workers · Info category: OPERATIONAL_RISK · 730 · Description: Government policy · Info category: STRATEGIC_RISK · 731 · Description: Policies or international agreements related to business operations · Info category: STRATEGIC_RISK · 751 · Description: Impact on the environment · Info category: OPERATIONAL_RISK
Risks from construction project management and contractors

Environment and Risk Factors

Construction is a complex process requiring coordination among numerous stakeholders, including designers, main contractors, subcontractors, material suppliers, and various government agencies for permits. Delays or deficiencies in any single step can impact the overall project schedule and cost.

In 2025, the Company established a new in-house engineering and architectural team, comprising civil engineers, project engineers, site supervisors, on-site project managers, and an architectural team. This significantly enhances the organization's capacity for overseeing and controlling the quality of construction work compared to the past. However, the Company still primarily relies on external contractors for major construction work.

Key construction risks monitored by the Company include:

  • Work Quality Risk: Some contractors may fail to comply with specified standards or use sub-standard materials, which could affect the quality of the final product delivered to customers.

  • Timeline Risk: Delays in construction projects directly impact the schedule for title transfers and revenue recognition, and may also incur additional costs from contract extensions and accrued interest.

  • Cost Risk: Construction material prices are volatile, and domestic labor costs tend to increase due to a shortage of skilled labor in certain sectors, which may result in actual construction costs exceeding estimates.

Risk of contractor bankruptcy or liquidity issues: In a volatile construction market, some contractors may experience financial difficulties, which could lead to construction work stoppages and the need to find new contractors.

Risks associated with the construction process may impact the Company in several areas, including project quality, operational timelines, costs, and overall performance.

Regarding construction quality, if a contractor fails to perform according to specified standards or uses substandard materials, this may result in completed projects of lower quality than expected, potentially leading to customer complaints, additional repair costs, and could affect the Company's reputation and credibility in the long run.

Regarding timelines, construction delays, whether due to project management issues, coordination among stakeholders, or contractor problems, may cause project completion schedules to be postponed, directly affecting the transfer of ownership and revenue recognition for the Company. Furthermore, such delays may incur additional financial costs, such as loan interest and increased project management expenses.

Regarding costs, fluctuations in construction material prices and rising labor costs may result in actual construction costs exceeding estimates, leading to a reduction in project profit margins, or in some cases, affecting the economic viability of the project.

In the event that a contractor experiences financial difficulties, lacks liquidity, or is unable to continue operations, this may lead to project disruption. The Company may incur additional time and costs in selecting and engaging a new contractor, and there may be delays in project delivery, which would impact cash flow and overall operational plans.

Although the Company has enhanced its internal capabilities by establishing engineering and architectural teams to improve the efficiency of construction control and supervision, the risks associated with reliance on external contractors remain a significant factor that could impact the Company's operational performance and financial position.

In summary, construction risks may have both short-term and long-term impacts on the Company's ability to execute projects, recognize revenue, achieve profitability, and maintain the confidence of its customers and stakeholders.

  • Close supervision by an in-house engineering team: The newly established in-house team of engineers and architects acts as the company's representative to supervise, inspect, and control the quality of the contractor's work throughout the construction process, from reviewing blueprints and inspecting materials to accepting work at each stage.

  • Standardized contractor selection process: The company establishes clear criteria for contractor selection, considering past experience and performance, financial stability, availability of personnel and equipment, and reputation for punctuality, requiring at least three bidders for each project tender.

  • Comprehensive construction contracts with clear penalties: The company prepares construction contracts that clearly and strictly define the scope of work, quality standards, timelines, penalties for late delivery, and warranty conditions, to protect the interests of the company and its clients.

  • Contract management and progress monitoring: The project management team regularly prepares progress reports of construction work compared to the work plan, to identify deviations and implement corrective actions early, before issues escalate.

  • Establishment of emergency contingency budgets: The company allocates contingency budgets for all construction projects to accommodate unexpected expenses that may arise from material price fluctuations, additional rework, or unforeseen events.

728 · Description: Volatility in the industry in which the company operates · Info category: STRATEGIC_RISK · 756 · Description: Change in laws and regulations · Info category: COMPLIANCE_RISK · 739 · Description: Shortage or reliance on skilled workers · Info category: OPERATIONAL_RISK · 730 · Description: Government policy · Info category: STRATEGIC_RISK · 764 · Description: Fluctuation in exchange rates, interest rates, or the inflation rate · Info category: FINANCIAL_RISK · 752 · Description: Impact from population structure · Info category: OPERATIONAL_RISK